Engie VianeoTours (37)Updated: 2026-04-08
ENGIE Vianeo - B&B HOTEL TOURS NORD 1 VAL DE LOIRE
Avenue André Maginot 311 -
Live specs & availability summaryThe charging station ENGIE Vianeo - B&B HOTEL TOURS NORD 1 VAL DE LOIRE, operated by Engie Vianeo in Tours, offers 1 charging stall(s) with output up to 300 kW (Fast DC).
Operating Status
Operational charge points
Station is reported in service in open registry.
Peak Power300 kW⚡ Ultra-rapide
Charging Points1 stèle1 type(s) de connecteurs
12h Reliability Score
69/100
FiableAvailable Connectors & Power
Breakdown of physical plugs installed at this site
CCS
Combo CCS (DC)DC
Connecteur standard européen pour la recharge rapide et ultra-rapide en courant continu (câble attaché).
300 kW1 prise
Charging Points Registry IDs (1)
FRVIAE20122168011300 kW
Geographical Location & Access
Avenue André Maginot 311 - (Tours)
Chargement de la carte d’accès...
Coordonnées GPS : 47.43022, 0.70611
Pricing & Badges
Payment and pass terms
Pricing estimate
Tarif non confirmé
Tarif dépendant de l’opérateur de mobilité et de l’éventuelle commission d’itinérance.
Direct Payment Options
Direct Credit CardYes (contactless)
Ad-hoc Payment (Web/App)Available
Compatible Charging Passes
⭐ Recommended passChargemap Pass
Note: Exact pricing may vary depending on your mobility service subscription and roaming agreements.
Operator Network: Engie Vianeo
Engie Vianeo fast and ultra-fast charging network on motorways, hotel car parks, and urban transit hubs.
Other EV charging stations in Tours
Nearby alternative stations in case of high occupancy
DRIVECO Partner Network50 kW
Carrefour Market - Tours Tonnelle
4 point(s) de chargeFiche →
Allego300 kW
Carrefour Energies by Allego - Tours
15 point(s) de chargeFiche →
Electra200 kW
Tours - Boulangerie Ange
4 point(s) de chargeFiche →
Herve Thermique22 kW
HERVE THERMIQUE JOUE LES TOURS
8 point(s) de chargeFiche →
Frequently Asked Questions
Practical answers to prepare your charging stop