TotalEnergiesMarseille (13)Updated: 2026-01-07

AMP | 2 Avenue Joseph Etienne (Ex Endoume)

2 Avenue Joseph Etienne

Live specs & availability summaryThe charging station AMP | 2 Avenue Joseph Etienne (Ex Endoume), operated by TotalEnergies in Marseille, offers 1 charging stall(s) with output up to 22 kW (AC).
Operating Status
Operational charge points

Station is reported in service in open registry.

Peak Power22 kWAccélérée
Charging Points1 stèle2 type(s) de connecteurs
12h Reliability Score
80/100
Très fiable

Available Connectors & Power

Breakdown of physical plugs installed at this site

T2
Type 2 (AC)AC

Connecteur universel pour la charge normale et accélérée en courant alternatif (utilisation de votre câble Type 2).

22 kW1 prise
CH
Prise domestique E/F (AC)AC

Prise standard 230V pour recharge de secours, deux-roues et hybrides rechargeables.

22 kW1 prise

Charging Points Registry IDs (1)

FRHXWE00842122 kW

Geographical Location & Access

2 Avenue Joseph Etienne (Marseille)

Chargement de la carte d’accès...
Coordonnées GPS : 43.28462, 5.35882

Pricing & Badges

Payment and pass terms

Pricing estimate
Tarif non confirmé

Tarif dépendant de l’opérateur de mobilité et de l’éventuelle commission d’itinérance.

Direct Payment Options
Direct Credit CardNo / Pass
Ad-hoc Payment (Web/App)Operator dependent
Compatible Charging Passes
⭐ Recommended passBadge Acteur Local

Note: Exact pricing may vary depending on your mobility service subscription and roaming agreements.

Operator Network: TotalEnergies

TotalEnergies charging network offering high-power hubs at service stations and urban commercial locations.

Other EV charging stations in Marseille

Nearby alternative stations in case of high occupancy

View all 5 stations in Marseille

Frequently Asked Questions

Practical answers to prepare your charging stop

ACUMVIO EV Tools & Guides