AllegoGrenoble (38)Updated: 2026-06-11

Carrefour Energies by Allego - Echirolles

Voie N°24 Villeneuve Bp 108

Live specs & availability summaryThe charging station Carrefour Energies by Allego - Echirolles, operated by Allego in Grenoble, offers 1 charging stall(s) with output up to 22 kW (AC).
Operating Status
Operational charge points

Station is reported in service in open registry.

Peak Power22 kWAccélérée
Charging Points1 stèle2 type(s) de connecteurs
12h Reliability Score
75/100
Fiable

Available Connectors & Power

Breakdown of physical plugs installed at this site

T2
Type 2 (AC)AC

Connecteur universel pour la charge normale et accélérée en courant alternatif (utilisation de votre câble Type 2).

22 kW1 prise
CH
Prise domestique E/F (AC)AC

Prise standard 230V pour recharge de secours, deux-roues et hybrides rechargeables.

22 kW1 prise

Charging Points Registry IDs (1)

FRALLEGO900528222 kW

Geographical Location & Access

Voie N°24 Villeneuve Bp 108 (Grenoble)

Chargement de la carte d’accès...
Coordonnées GPS : 45.15877, 5.72421

Pricing & Badges

Payment and pass terms

Pricing estimate
Tarif non confirmé

Tarif dépendant de l’opérateur de mobilité et de l’éventuelle commission d’itinérance.

Direct Payment Options
Direct Credit CardYes (contactless)
Ad-hoc Payment (Web/App)Available
Compatible Charging Passes
⭐ Recommended passBadge Acteur Local

Note: Exact pricing may vary depending on your mobility service subscription and roaming agreements.

Operator Network: Allego

Pan-European fast and ultra-fast charging network partnered with major retail centers and highway corridors.

Other EV charging stations in Grenoble

Nearby alternative stations in case of high occupancy

View all 8 stations in Grenoble

Frequently Asked Questions

Practical answers to prepare your charging stop

ACUMVIO EV Tools & Guides